An example of a bridge project plan created with TILOS
The Höckler bridge in Switzerland was one of the bridges where TILOS was used to show the work not only as a Gantt chart, but also as a time distance diagram:
The drawing was imported from the CAD system as a WMF file. To connect the curved bridge with the straight distance axis, connector lines were added.