The Brenner Base Tunnel is a 55-kilometre (34 mi) long railway tunnel through the base of the Eastern Alps beneath the Brenner Pass. In total it’s about 220 km of tunnel drilling.

The travel time from Innsbruck to Bolzano will be reduced from 2 hours to 50 minutes.

Scheduled opening is 2026.

Expected cost including risk:

8.5 Billion Euro

11 Billion USD

example tunnel project plan

Some of the brands that trust TILOS

You May Also Be Interested In:

What Do I Need To Use TILOS?

Read about TILOS technical specifications and requirements

View Sample Linear Project Schedules

See Sample Linear Project Schedules

The Advantages of the Linear Scheduling Method

Learn more about the advantages of the linear scheduling method

TRIMBLE TILOS: Global Leader in Linear Project Planning Since 1999

Learn more about what TILOS can do for you. 

Compare: TILOS Linear Software VS. Other Linear Planning Software.

Learn More About The Globe’s Premier Linear Scheduling Software

Learn more about the industries that rely on TILOS

for an accurate, comprehensive linear infrastructure project plan.